D9.2 Follow-up report of CORALIS demonstration sites (CO)
Publishable summary: Industrial symbiosis (IS) solutions usually involve the transfer of any form of waste material and/or energy flows between stakeholders for valorisation and environmental impact reduction purposes. The success of the transaction may be
D11.6 Mid-term report on communication and dissemination activities (PU)
Publishable summary: This deliverable presents the Mid-term report on communication and dissemination activities for CORALIS, describing the implementation of the Communication and Dissemination (C&D) Plan, which has guided the consortium’s communication and dissemination activities in
D8.4 Engagement activities in the CORALIS follower cases to promote participatory processes in the definition of each IS follower case (PU)
Introduction and objectives: The pursuit of sustainable and circular solutions has become increasingly vital in today’s rapidly evolving world. Industrial symbiosis, a concept that fosters the collaboration and exchange of resources between industries, offers a
D8.3 Feasibility analysis for the valorisation of spent caustic (CO)
Publishable Summary: This deliverable aims to present the findings of the efforts for the feasibility studies for valorisation of spent caustic. Information related to the results from literature research, detailed characterization of spent caustic, the
D5.5 IS solution implemented in the QSr process (CO)
Publishable summary: This report focuses on the installation and construction of an innovative process for the production of KNO3 in a very integrated IS environment. The works referred to in this deliverable have been carried
D8.1 Technoeconomic analysis and business model of an energy recovery system in Basauri (CO)
Publishable summary: As recommendation, include an abstract of the main activities and objective results of the DLV considering the scope of the DLV and the project objectives. If suitable, include the most relevant and descriptive
D7.4 Commissioning of all the equipment and pilot plants (CO)
Introduction: The aim of this report is to demonstrate, in a schematic description, the installation of the new plants required for the recovery and valorisation of industrial materials involved industrial sites since it is a
D7.3: Design and Engineering of all equipment and pilot plants (CO)
Introduction: In the Brescia demo-case, the main objective is to implement technologies for industrial waste treatment waste valorisation and landfill prevention. This will be applied in a total of 4 metal production factories for the
D7.2: ROM for CORALIS platform (CO)
Introduction: The aim of this report is to present a model able to evaluate the IS in the Brescia site. The validation of this model has been performed by implementing real off-line data and using
D7.1 Characterisation of main by-products, streams and processes in the province of Brescia (CO)
Introduction: The aim of this report is to provide a quantification of the residual materials and their destinations according to the overall configuration of Brescia demo-site. The performed analysis included wastes in the demo-case and