Dissemination materials2021-01-05T15:55:28+00:00

DISSEMINATION MATERIALS

D6.5 Operational demonstration facility (CO)

Publishable summary: The summary of the work within work package 6 concludes the work of bringing into full operation a full-scale greenhouse, supplied with waste heat and CO2 from the papermill our industrial partner, thereby

D5.4 Construction of HCl Concentration System (CO)

Summary Report: This report focuses on the calculations, design, and construction of a pilot plant with the objective to simulate at small and isolated scale a novel process for Hydrogen Chloride (HCl) concentration. This process

D5.3 Construction of KNO3 reactor (CO)

Publishable summary: Objectives and progress status The basic Engineering of the new KNO3 plant based on ion exchange mobile resins is finished, after scaling up from a pilot plant to the Demo plant Capacity. INCRO

D5.2 ROM for CORALIS platform (CO)

Publishable summary: The objective of Deliverable 5.2 (D5.2) consists on the development of Reduced Order Models (RoMs) derived from the comprehensive full-order models presented in the previous deliverable, D5.1. The approach presented in this deliverable

Go to Top